68743 / Gondia Itwari MEMU
गोंदिया - इतवारी मेमू

Departs @ 09:40 (Gondia Junction)

SunMonTueWedThuFriSat

Arrives @ 12:30 (NSCB Itwari Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 68743/Gondia Itwari MEMU including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Gondia Junction

Gondia Itwari MEMU (68743) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 09:40

PF: 3

Day: 1

Arr.: 09:50

Halt: 1m

Dist: 14.5

Dep.: 09:51

PF: -

Day: 1

Arr.: 09:58

Halt: 1m

Dist: 22.8

Dep.: 09:59

PF: -

Day: 1

4. TRO / Tirora

Arr.: 10:04

Halt: 2m

Dist: 29.6

Dep.: 10:06

PF: -

Day: 1

Arr.: 10:14

Halt: 1m

Dist: 39.6

Dep.: 10:15

PF: -

Day: 1

Arr.: 10:24

Halt: 2m

Dist: 49.7

Dep.: 10:26

PF: -

Day: 1

7. KOKA / Koka

Arr.: 10:33

Halt: 1m

Dist: 59.9

Dep.: 10:34

PF: -

Day: 1

Arr.: 10:40

Halt: 2m

Dist: 67.9

Dep.: 10:42

PF: -

Day: 1

9. KHAT / Khat

Arr.: 10:51

Halt: 1m

Dist: 77.8

Dep.: 10:52

PF: -

Day: 1

10. RRL / Rewral

Arr.: 10:59

Halt: 1m

Dist: 86.8

Dep.: 11:00

PF: -

Day: 1

11. TAR / Tharsa

Arr.: 11:04

Halt: 2m

Dist: 92.4

Dep.: 11:06

PF: -

Day: 1

Arr.: 11:13

Halt: 1m

Dist: 98.8

Dep.: 11:14

PF: -

Day: 1

13. SAL / Salwa

Arr.: 11:20

Halt: 1m

Dist: 105.3

Dep.: 11:21

PF: -

Day: 1

Arr.: 11:25

Halt: 2m

Dist: 111.3

Dep.: 11:27

PF: -

Day: 1

15. KP / Kamptee

Arr.: 11:33

Halt: 2m

Dist: 115.7

Dep.: 11:35

PF: -

Day: 1

16. KAV / Kalamna

Arr.: 11:48

Halt: 2m

Dist: 123.4

Dep.: 11:50

PF: -

Day: 1

Arr.: 12:30

-

Dist: 126.0

Dep.: Dest

PF: -

Day: 1

Last Updated: 17-Jul-19 15:59 IST
68743 / Gondia Itwari MEMU (गोंदिया - इतवारी मेमू) train operated by the South East Central Railway which runs between Gondia Junction and NSCB Itwari Junction. The train leaves from Gondia Junction Daily at 09:40 hrs and reaches NSCB Itwari Junction at 12:30 hrs

The train, during its journey from Gondia Junction, crosses 15 railway station and terminates at NSCB Itwari Junction. It takes 2 hours and 50 minutes for this train to complete its entire journey of 126 kilometers.

The return train is 68744.