02813 / Bhubaneswar - Anand Vihar Terminal SF Special
भुवनेश्वर - आनंद विहार टर्मिनल सुपरफास्ट विशेष
(ଭୁବନେଶ୍ବର - ଆନନ୍ଦ ବିହାର ଟର୍ମିନାଲ ସୁପରଫାଷ୍ଟ ସ୍ପେଶିଆଲ)

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 12:30 (Bhubaneswar)

SunMonTueWedThuFriSat

Arrives @ 19:35 +1 night (Anand Vihar Terminal)

SunMonTueWedThuFriSat

The following table shows the schedule of 02813/Bhubaneswar - Anand Vihar Terminal SF Special including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Bhubaneswar

Bhubaneswar - Anand Vihar Terminal SF Special (02813) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 12:30

PF: -

Day: 1

Arr.: 13:26

Halt: 2m

Dist: 61.5

Dep.: 13:28

PF: -

Day: 1

3. ANGL / Angul

Arr.: 15:00

Halt: 2m

Dist: 121.8

Dep.: 15:02

PF: -

Day: 1

Arr.: 16:04

Halt: 2m

Dist: 207.5

Dep.: 16:06

PF: -

Day: 1

Arr.: 17:00

Halt: 5m

Dist: 272.6

Dep.: 17:05

PF: -

Day: 1

Arr.: 18:35

Halt: 5m

Dist: 317.7

Dep.: 18:40

PF: -

Day: 1

Arr.: 20:00

Halt: 15m

Dist: 418.9

Dep.: 20:15

PF: -

Day: 1

Arr.: 21:40

Halt: 5m

Dist: 519.9

Dep.: 21:45

PF: -

Day: 1

Arr.: 00:40

Halt: 2m

Dist: 649.6

Dep.: 00:42

PF: 3

Day: 2

Arr.: 02:05

Halt: 10m

Dist: 702.4

Dep.: 02:15

PF: -

Day: 2

Arr.: 02:46

Halt: 2m

Dist: 717.8

Dep.: 02:48

PF: -

Day: 2

Arr.: 03:10

Halt: 5m

Dist: 734.7

Dep.: 03:15

PF: -

Day: 2

Arr.: 04:16

Halt: 2m

Dist: 828.2

Dep.: 04:18

PF: -

Day: 2

Arr.: 05:40

Halt: 5m

Dist: 904.4

Dep.: 05:45

PF: 1

Day: 2

Arr.: 08:30

Halt: 10m

Dist: 1109.4

Dep.: 08:40

PF: -

Day: 2

Arr.: 10:55

Halt: 5m

Dist: 1262.0

Dep.: 11:00

PF: -

Day: 2

Arr.: 13:20

Halt: 10m

Dist: 1456.5

Dep.: 13:30

PF: -

Day: 2

Arr.: 19:35

-

Dist: 1884.5

Dep.: Dest

PF: -

Day: 2

Last Updated: 10-Jul-21 12:08 IST
02813 / Bhubaneswar - Anand Vihar Terminal SF Special (भुवनेश्वर - आनंद विहार टर्मिनल सुपरफास्ट विशेष / ଭୁବନେଶ୍ବର - ଆନନ୍ଦ ବିହାର ଟର୍ମିନାଲ ସୁପରଫାଷ୍ଟ ସ୍ପେଶିଆଲ) train operated by the East Coast Railway which runs between Bhubaneswar and Anand Vihar Terminal. The train leaves from Bhubaneswar on Saturday at 12:30 hrs and reaches Anand Vihar Terminal at 19:35 hrs

The train, during its journey from Bhubaneswar, crosses 16 railway station and terminates at Anand Vihar Terminal. It takes 31 hours and 05 minutes for this train to complete its entire journey of 1885 kilometers.

The return train is 02814.