06820 / Kumbakonam - Mayiladuturai Passenger Special
कुंभकोणम - मयिलाडुतुरै पैसेंजर विशेष

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.

Departs @ 19:27 (Kumbakonam)

SunMonTueWedThuFriSat

Arrives @ 20:25 (Mayiladuturai Junction)

SunMonTueWedThuFriSat

The following table shows the schedule of 06820/Kumbakonam - Mayiladuturai Passenger Special including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Kumbakonam

Kumbakonam - Mayiladuturai Passenger Special (06820) Schedule

Arr.: Source

-

Dist: 0.0

Dep.: 19:27

PF: -

Day: 1

Arr.: 19:30

Halt: 1m

Dist: 5.0

Dep.: 19:31

PF: -

Day: 1

Arr.: 19:32

Halt: 1m

Dist: 9.0

Dep.: 19:33

PF: -

Day: 1

Arr.: 19:34

Halt: 1m

Dist: 12.0

Dep.: 19:35

PF: -

Day: 1

Arr.: 19:36

Halt: 1m

Dist: 17.0

Dep.: 19:37

PF: -

Day: 1

Arr.: 19:39

Halt: 1m

Dist: 23.0

Dep.: 19:40

PF: -

Day: 1

Arr.: 19:47

Halt: 1m

Dist: 27.0

Dep.: 19:48

PF: -

Day: 1

Arr.: 20:25

-

Dist: 32.0

Dep.: Dest

PF: -

Day: 1

Last Updated: 01-Jul-19 05:30 IST
06820 / Kumbakonam - Mayiladuturai Passenger Special (कुंभकोणम - मयिलाडुतुरै पैसेंजर विशेष) train operated by the Southern Railway which runs between Kumbakonam and Mayiladuturai Junction. The train leaves from Kumbakonam Daily at 19:27 hrs and reaches Mayiladuturai Junction at 20:25 hrs

The train, during its journey from Kumbakonam, crosses 6 railway station and terminates at Mayiladuturai Junction. It takes 58 minutes for this train to complete its entire journey of 32 kilometers.

The return train is 06819.