56826 / Tirunelveli Erode Passenger
तिरुनेलवेली - इरोड पैसेंजर

Today Departure from Tirunelveli Junction is cancelled
The following table shows the schedule of 56826/Tirunelveli Erode Passenger including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Tirunelveli Junction
.
Departs @ 05:05 (Tirunelveli Junction)
SMTWTFS
Arrives @ 14:40 (Erode Junction)
SMTWTFS

Tirunelveli Erode Passenger (56826) Schedule

S#

Code

Station

Arr.

Dept.

Halt

PF

Dist.

Day

Zone

1.

05:05

-

3

0.0

1

SR

2.

05:14

05:15

1m

1

6.8

1

SR

3.

05:24

05:25

1m

1

14.5

1

SR

4.

05:34

05:35

1m

1,2

22.1

1

SR

5.

05:59

06:00

1m

-

29.0

1

SR

6.

06:14

06:15

1m

-

42.9

1

SR

7.

06:39

06:40

1m

-

65.2

1

SR

8.

07:04

07:05

1m

-

86.8

1

SR

9.

07:14

07:15

1m

1

98.3

1

SR

10.

07:58

08:00

2m

2

113.7

1

SR

11.

08:11

08:12

1m

-

125.1

1

SR

12.

08:24

08:25

1m

-

139.7

1

SR

13.

08:39

08:40

1m

-

150.2

1

SR

14.

09:20

09:25

5m

3

157.1

1

SR

15.

09:44

09:45

1m

2

178.3

1

SR

16.

09:53

09:54

1m

-

186.1

1

SR

17.

10:04

10:05

1m

-

197.3

1

SR

18.

10:19

10:20

1m

-

208.0

1

SR

19.

11:00

11:20

20m

-

219.5

1

SR

20.

11:43

11:45

2m

-

239.6

1

SR

21.

12:09

12:10

1m

1

263.8

1

SR

22.

12:29

12:30

1m

1

277.7

1

SR

23.

12:57

13:00

3m

-

293.4

1

SR

24.

13:19

13:20

1m

1

307.8

1

SR

25.

13:34

13:35

1m

1

319.9

1

SR

26.

13:44

13:45

1m

-

326.0

1

SR

27.

13:59

14:00

1m

1

339.4

1

SR

28.

14:40

-

3

358.3

1

SR

Last Updated: 20-Jul-19 21:52 IST
56826 / Tirunelveli Erode Passenger (तिरुनेलवेली - इरोड पैसेंजर) train operated by the Southern Railway which runs between Tirunelveli Junction and Erode Junction. The train leaves from Tirunelveli Junction Daily at 05:05 hrs and reaches Erode Junction at 14:40 hrs

The train, during its journey from Tirunelveli Junction, crosses 26 railway station and terminates at Erode Junction. It takes 9 hours and 35 minutes for this train to complete its entire journey of 358 kilometers.

The return train is 56825.
Loading...