17318 / Mumbai LTT - Hubballi Express (via Belagavi)
मुंबई एलटीटी - हुब्बल्ली एक्सप्रेस

Today Departure from Lokmanya Tilak Terminus is cancelled
The following table shows the schedule of 17318/Mumbai LTT - Hubballi Express including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Lokmanya Tilak Terminus
.
Departs @ 18:45 (Lokmanya Tilak Terminus)
SMTWTFS
Arrives @ 11:20 +1 night (Hubballi Junction)
SMTWTFS

Mumbai LTT - Hubballi Express (17318) Schedule

S# Code Station Arr. Dep. Halt PF Dist. Day Zone
1. LTT Lokmanya Tilak Terminus 18:45 - 3 0.0 1 CR
2. TNA Thane 19:08 19:10 2m 7 16.5 1 CR
3. PNVL Panvel Junction 19:42 19:45 3m 7 49.3 1 CR
4. LNL Lonavala 21:38 21:40 2m 1 105.4 1 CR
5. PUNE Pune Junction 23:05 23:10 5m 4 169.1 1 CR
6. STR Satara 02:37 02:40 3m - 314.5 2 CR
7. KRD Karad 03:32 03:35 3m - 373.2 2 CR
8. SLI Sangli 04:42 04:45 3m - 441.3 2 CR
9. MRJ Miraj Junction 05:20 05:25 5m - 448.4 2 CR
10. KUD Kudachi 05:59 06:00 1m 1 481.3 2 SWR
11. GPB Ghatprabha 06:39 06:40 1m 1 527.9 2 SWR
12. BGM Belagavi 07:48 07:50 2m 3 585.8 2 SWR
13. LD Londa Junction 08:40 08:42 2m - 637.0 2 SWR
14. LWR Alnavar Junction 09:25 09:26 1m - 670.6 2 SWR
15. DWR Dharwad 10:20 10:22 2m 2 707.4 2 SWR
16. UBL Hubballi Junction 11:20 - 5 727.8 2 SWR
Last Updated: 19-Jul-19 13:04 IST
17318 / Mumbai LTT - Hubballi Express (मुंबई एलटीटी - हुब्बल्ली एक्सप्रेस) train operated by the South Western Railway which runs between Lokmanya Tilak Terminus and Hubballi Junction. The train leaves from Lokmanya Tilak Terminus on at 18:45 hrs and reaches Hubballi Junction at 11:20 hrs

The train, during its journey from Lokmanya Tilak Terminus, crosses 14 railway station and terminates at Hubballi Junction. It takes 16 hours and 35 minutes for this train to complete its entire journey of 728 kilometers.

The return train is 17317.
Loading...