Indian Railways has begun passenger train operations with COVID-19 special trains in a gradual manner. All regular trains still canceled until further order.

01187 / Mumbai LTT – Ratnagiri AC Double Decker Ganapati Special
लोकमान्य तिलक टर्मिनस - रत्नागिरी वातानुकूलित डबल डेकर गणपति विशेष

TRAIN IS CANCELLED. Status may Change. Please confirm through other sources.
The following table shows the schedule of 01187/Mumbai LTT – Ratnagiri AC Double Decker Ganapati Special including timing along with its arrival and departure time at each station with Platform number. The distance column shows the distance traveled by the train from its starting point from Lokmanya Tilak Terminus
.
Departs @ 05:33 (Lokmanya Tilak Terminus)
SMTWTFS
Arrives @ 14:30 (Ratnagiri)
SMTWTFS

Mumbai LTT – Ratnagiri AC Double Decker Ganapati Special (01187) Schedule

S#

Code

Station

Arr.

Dept.

Halt

PF

Dist.

Day

Zone

1.

05:33

-

-

0.0

1

CR

2.

05:50

05:55

5m

7

16.5

1

CR

3.

06:40

06:45

5m

-

49.5

1

CR

4.

08:20

08:25

5m

-

124.3

1

CR

5.

08:52

08:57

5m

-

154.7

1

KR

6.

09:10

09:15

5m

1

171.3

1

KR

7.

10:05

10:10

5m

-

222.7

1

KR

8.

10:40

10:45

5m

-

252.3

1

KR

9.

11:15

11:20

5m

1

270.8

1

KR

10.

11:35

11:40

5m

1

274.5

1

KR

11.

12:00

12:05

5m

-

294.8

1

KR

12.

14:30

-

-

327.7

1

KR

Last Updated: 01-Jul-19 05:30 IST
01187 / Mumbai LTT – Ratnagiri AC Double Decker Ganapati Special (लोकमान्य तिलक टर्मिनस - रत्नागिरी वातानुकूलित डबल डेकर गणपति विशेष) train operated by the Central Railway which runs between Lokmanya Tilak Terminus and Ratnagiri. The train leaves from Lokmanya Tilak Terminus on Tuesday at 05:33 hrs and reaches Ratnagiri at 14:30 hrs

The train, during its journey from Lokmanya Tilak Terminus, crosses 10 railway station and terminates at Ratnagiri. It takes 8 hours and 57 minutes for this train to complete its entire journey of 328 kilometers.

The return train is 01188.
Loading...